Uhpc OEM Built-in Fitting Flat Lifting Socket with Cross Pin

Product Details
Customization: Available
Application: Construction Material
Certification: CE, ISO
Still deciding? Get samples of US$ 0.09/Piece
Request Sample
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2022

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Number of Employees
19
Year of Establishment
2002-07-11
  • Uhpc OEM Built-in Fitting Flat Lifting Socket with Cross Pin
  • Uhpc OEM Built-in Fitting Flat Lifting Socket with Cross Pin
  • Uhpc OEM Built-in Fitting Flat Lifting Socket with Cross Pin
  • Uhpc OEM Built-in Fitting Flat Lifting Socket with Cross Pin
  • Uhpc OEM Built-in Fitting Flat Lifting Socket with Cross Pin
  • Uhpc OEM Built-in Fitting Flat Lifting Socket with Cross Pin
Find Similar Products

Basic Info.

Model NO.
Flat lifting socket with cross pin
Color
Golden
Production Time
15-20 Days
Application Scenarios
Industrial Architecture
Design Style
Contemporary
Feature
Durable
Certificate
ISO
Export Markets
Global
Service
OEM
Process Method
Blanking, Punching, Bending, Forming
Industry
Metal Stamping Parts
Process
Forming Process
Surface Processing
Electroplating
Fine Blanking
Open
Customized
Yes
Function
Strengthen
Material
Metal
After-sales Service
Online Technical Support
Warranty
1 Year
Type
Flat Lifting Socket with Cross Pin
Transport Package
Container
Specification
According to the model
Trademark
DAYE
Origin
Jiangxi Ganzhou
HS Code
7326201000
Production Capacity
10000 Tons/Year

Product Description

FLAT LIFITING SOCKET WITH CROSS PIN
Uhpc OEM Built-in Fitting Flat Lifting Socket with Cross Pin
Flat Lifting Socket With Cross Pin  
Art.No. Specification Safe Working Load(kg) Length(mm)
ZHFCP001 M8*50 250 50
ZHFCP002 M10*60 450 60
ZHFCP003 M12*60 500 60
ZHFCP004 M14*80 700 80
ZHFCP005 M16*100 1000 100
ZHFCP006 M20*100 1250 100
ZHFCP007 *24*120 1700 120
LIFTING SOCKET WITH CROSS BAR

Uhpc OEM Built-in Fitting Flat Lifting Socket with Cross Pin
Lifting Socket With Cross Bar      
          Dimensiors(mm)  
  Art.No. Specifaication Safe Working Load(KG) Thread d L e g F
  ZHLC001 M10*42 600 M10 42 22   50
  ZHLC002 M12*50 900 M12 50 20 10 75
  ZHLC003 M12*75 900 M12 75 40 10 75
  ZHLC004 M16*75 1700 M16 75 40   75
  ZHLC005 M20*75 2300 M20 75 35   90
  ZHLC006 M54*100 3000 M24 100 35 16 100

LIFTING SOCKETS WITH PLATE AND BOLTS
Uhpc OEM Built-in Fitting Flat Lifting Socket with Cross Pin


 
Lifting Sockets With Plate And Bolts      
Art.NO. Dimensions  
MD(mm) D(mm) e(mm) L(mm) W(mm) Square Plate Thickness Safe Working Load
ZHLPB001 M12*1.75 16 28 55 40*40 4 500
ZHLPB002 M16*1.75 22 29 75 50*50 5 1200
ZHLPB003 M20*2.5 26 35 90 60*60 5 2000
ZHLPB004 M24*3.0 32 46 110 80*80 6 2500
ZHLPB005 M30*3.5 40 60 140 95*95 6 4000

Embedded parts: built-in fitting

Application:
Fixed use for connecting structural components or non-structural components

Material: metal Process

1.Measuring positioning:


 First, the technician is familiar with the drawings, makes the measurement technology disclosure, and then the full-  time surveyor draws out the control wire and elevation control wire of the embedded parts and bolts from the  measurement control network according to the technical measurement requirements.Then according to the design of the embedded anchor bolts and embedded parts of the center, the height of the specific location.

2.stationary barrier:

Put the relative elevation point on the fixed support standing pile, the bottom should be welded reliably, completely separated from the formwork fixing frame, steel fixing frame, etc., and ensure that the fixing frame should have enough stiffness and stability.


3.Put the bolt

After the fixing frame is installed, the bolt installation should be fixed according to the positioning line, and then adjust the elevation, and temporarily reinforce according to the requirements of the scheme.

4.The retest is fixed at the end

After placing the bolts and embedded parts are installed, the surveyor shall adjust and check the bolts and embedded parts again. After the inspection meets the standard requirements, the lower bolt shall be firmly fixed with the fixing frame.At the same time, the bolt fixing frame in the two directions of welding scissors to be strengthened

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier