This product is no longer promoted on Made-in-China.com. If you find any infringement or sensitive information of it, please contact us for handling. Thank you.

Uhpc OEM Built-in Fitting Waved Rod Bar Socket

Product Details
Application: Construction Material
Certification: CE, ISO
Color: Golden
  • Uhpc OEM Built-in Fitting Waved Rod Bar Socket
  • Uhpc OEM Built-in Fitting Waved Rod Bar Socket
  • Uhpc OEM Built-in Fitting Waved Rod Bar Socket
  • Uhpc OEM Built-in Fitting Waved Rod Bar Socket
  • Uhpc OEM Built-in Fitting Waved Rod Bar Socket
  • Uhpc OEM Built-in Fitting Waved Rod Bar Socket
Find Similar Products

Basic Info.

Model NO.
Waved Rod Bar Socket
Production Time
15-20 Days
Application Scenarios
Industrial Architecture
Design Style
Contemporary
Feature
Durable
Certificate
ISO
Export Markets
Global
Service
OEM
Process Method
Blanking, Punching, Bending, Forming
Industry
Metal Stamping Parts
Process
Forming Process
Surface Processing
Electroplating
Fine Blanking
Open
Customized
Yes
Function
Strengthen
Material
Metal
After-sales Service
Online Technical Support
Warranty
1 Year
Type
Waved Rod Bar Socket
Transport Package
Container
Specification
According to the model
Trademark
DAYE
Origin
Jiangxi Ganzhou
HS Code
7326201000
Production Capacity
10000 Tons/Year

Product Description

WAVED ROD BAR SOCKET

 
Waved Rod Bar Socket                        
Art.No. Approximate dimension(mm)         Load stages Metric thread Round Thread(Rd) Appox.weight per 100 pieces
       
d p g   kg d*l(mm) Reference No. d*l(mm) Reference No. kg
ZHWRBS101 M+Rd 12 8 25 500 M12*150 K 3112km Rd12*150 k 3112kr 9.00 
ZHWRBS102 M+Rd 14 10 25 800 M14*180 K 3114km Rd14*180 k 3114kr 16.61 
ZHWRBS103 M+Rd 16 12 27 1200 M16*230 K 3116km Rd16*230 k 3116kr 28.48 
ZHWRBS104 M+Rd 18 14 34 1600     Rd18*260 k 3118kr 40.27 
ZHWRBS105 M+Rd 20 14 35 2000 M20*260 K 3120km Rd20*260 k 3120kr 47.38 
ZHWRBS106 M+Rd 24 16 43 2500 M24*300 K 3124km Rd24*300 k 3124kr 74.27 
ZHWRBS107 M+Rd 30 20 56 4000 M30*420 K 3130km Rd30*420 k 3130kr 156.80 
ZHWRBS108 M+Rd 36 25 69 6300 M36*460 K 3136km Rd36*420 k 3136kr 292.29 
ZHWRBS109 M+Rd 42 28 80 8000 M42*500 K 3142km Rd42*500 k 3142kr 416.00 
                             
Art.No. Approximate dimension(mm)         Load stages Metric thread Round Thread(Rd) Appox.weight per 100 pieces
       
d p g   kg d*l(mm) Reference No. d*l(mm) Reference No. kg
ZHWRBS201 M+Rd 12 8 25 500 M12*300 k 3112lm Rd12*300 k 3112lr 14.92 
ZHWRBS202 M+Rd 14 10 25 800 M14*310 k 3114lm Rd14*310 k 3114lr  25.00 
ZHWRBS203 M+Rd 16 12 27 1200 M16*320 k 3116lm Rd16*320 k 3116lr 37.30 
ZHWRBS204 M+Rd 18 14 34 1600     Rd18*360 k 3118lr  50.94 
ZHWRBS205 M+Rd 20 14 35 2000 M20*400 k 3120lm Rd20*400 k 3120lr  63.90 
ZHWRBS206 M+Rd 24 16 43 2500 M24*450 k 3124lm Rd24*450 k 3124lr 98.17 
ZHWRBS207 M+Rd 30 20 56 4000 M30*600 k 3130lm Rd30*600 k 3130lr  202.45 
ZHWRBS208 M+Rd 36 25 69 6300 M36*750 k 3136lm Rd36*750 k 3136lr 428.77 
ZHWRBS209 M+Rd 42 28 80 8000 M42*850 k 3142lm Rd42*850 k 3142lr  510.00 
ZHWRBS210 M+Rd 52 32 97 12500 M52*920 k 3152lm Rd52*920 k 3152lr 780.00 

Embedded parts: built-in fitting

Application:
Fixed use for connecting structural components or non-structural components

Material: metal Process

1.Measuring positioning:


 First, the technician is familiar with the drawings, makes the measurement technology disclosure, and then the full-  time surveyor draws out the control wire and elevation control wire of the embedded parts and bolts from the  measurement control network according to the technical measurement requirements.Then according to the design of the embedded anchor bolts and embedded parts of the center, the height of the specific location.

2.stationary barrier:

Put the relative elevation point on the fixed support standing pile, the bottom should be welded reliably, completely separated from the formwork fixing frame, steel fixing frame, etc., and ensure that the fixing frame should have enough stiffness and stability.


3.Put the bolt

After the fixing frame is installed, the bolt installation should be fixed according to the positioning line, and then adjust the elevation, and temporarily reinforce according to the requirements of the scheme.

4.The retest is fixed at the end

After placing the bolts and embedded parts are installed, the surveyor shall adjust and check the bolts and embedded parts again. After the inspection meets the standard requirements, the lower bolt shall be firmly fixed with the fixing frame.At the same time, the bolt fixing frame in the two directions of welding scissors to be strengthened

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now